Cork City Traveller Accommodation Programme 2025 - 2029

04.6 Gap Analysis The Gap Analysis examines the existing and forecasted future accommodation requirements in the context of the current annual delivery rates in the previous TAP period, to identify any potential gaps in the quantity, type and distribution of current and planned/proposed provision of Traveller accommodation. In Table 9 the estimated existing accommodation requirement figures, as set out in Table 6, have been combined with the projected requirements outlined in Table 8. These are compared with delivery rates by accommodation tenure type in the following sections.

Table 9 Existing and Projected Housing Need to 2029 by Tenure Type

Overall Accommod ation Need

Approved Housing Body

LA Housing

Group Housing

Halting Site

HAP/ RAS

Total

Existing Need

50

13

44

2

1

110

Projected Need

28

7

24

1

1

61

Total Existing and Projected Need to 2029

78

20

68

3

2

171

43

Cork City Council | Traveller Accommodation Programme 2025-2029