the number of units of accommodation proposed to be delivered for each of the five years of the programme for Traveller specific accommodation (group housing, bays on halting sites, including the need for transient sites), both new and refurbished as well as standard housing. The overall five-year targets are set out in Table 15.
07.2 Annual Targets The Guidelines specify that to facilitate monitoring of progress on the implementation of the programme, annual targets should be included in programmes. The targets should include details of
Table 15 Traveller Accommodation Annual Delivery Programme
Housing Delivery Breakdown by Type
TAP Program
TAP Overall Target
Annual Total
2025
2026
2027
2028
2029
Group Housing Scheme
Proposed Delivery Mechanism
Standard Housing
Clustered Housing
78 (50 existing need, 28 projected) 20 (13 existing need, 7 projected) 68 (44 existing need, 24 projected) 3 (2 existing need, 1 projected) 2 (1 existing need, 1 projected)
LA Housing
12
14
16
18
19
79
47
32
0
Ref Item 1
Ref Item 2
Approved Housing Body
2
4
6
4
6
22
6
16
0
Ref Item 3
Existing Model Group Housing Scheme
4
27
15
9
8
63
0
0
63
Ref Item 4
HAP/RAS
1
1
1
1
1
5
5
0
0
Ref Item 5
Halting Site
2
9 *
0
0
0
2
0
0
0
46 & 9 *
Total
171
171
58
48
63
21
38
32
34
63
Cork City Council | Traveller Accommodation Programme 2025-2029
Powered by FlippingBook