Part 8 Design Statement - Elizabeth Fort, Cork City

CAR PARK

Car Park

E.S.B. Service pipes are not generally shown but their presence should always be anticipated. High pressure transmission pipelines are shown in red. If a transmission pipeline is identified within 10m of any intended excavations then work must not proceed before GNI has been consulted. The true location and depth of a transmission pipeline must be verified on site by a representative of GNI. Contact can be made through 1800 427 747. All work in the vicinity of the gas network must be completed in accordance with the E.S.B. E.S.B. Mh current edition of the Health & Safety Authority publication, Code of Practice For Avoiding Danger From Underground Services which is available from the Health and Safety Authority (01 614 7 00) or can be downloaded at www.hsa.ie. LS Nano Nagle Bridge Important Safety Notice: Damage to gas pipelines can result in serious injury or death. Gas network information is provided as a general guide. The exact location and depth of medium or low pressure distribution gas pipes must be verified on site by carrying out necessary investigations, including, for example, hand digging trial holes along the route of the pipe. 2 In ST 75 mbar Mh LS 2.8 LS Mh Mh 180 PE-A [14 In] 75 mbar

Tk

ED Bdy

E.S.B.

LS

3A

Mh

Church (Site of)

Tks

Mh

NORTH.

South Gate Bridge

2B

E.S.B.

ET

LS

Mh

H

Dean's Hall

CASTLE

[2 In]

E.S.B.

Mh

180 PE-X [10

H

3.1

180 PE-X [10 In] 75 mbar

Mh

2A

2A

ET Legal Notice:

ET

LS

Weir

Mh

ET

1A

2A Gas Networks Ireland (GNI) and its affiliates, accept no responsibility for the accuracy of any information contained in this document including data concerning location and technical designation of the gas distribution and transmission network (the Information). The Information should not be relied on for accurate distance or depth of cover measurements. (10 In) C=1.0m C=0.47 TT C=0.75

School

E.S.B.

3.6 C=0.9 ET ?T

LS

C=0.8

E.S.B.

LS

C=0.8

63 PE 75 mbar

3A

63 PE-X 75 mbar

E.S.B.

5.3

63 PE 75 mbar (Unverified)

E.S.B.

2A

LS

Slipway

2

2A

LS TT

3

E.S.B.

63 PE-X [3 In] 75 mbar

UT

H

LS

H

H

LS

Mhs Any representations and warranties, express or implied, are excluded to the fullest extent permitted by law. No liability shall be accepted for any loss or damage including, without limitation, direct, indirect or consequential loss, arising out of or in connection with the use or re-use of the Information. Mh Mh

E.S.B.

MER 19374

Mh

LS

CONVENT PLACE

E.S.B.

2A

Mh UT

Abbey (Site of)

3A

H

LS

LS

Mhs

E.S.B.

E.S.B.

LS

2A

2A

C=0.6

E.S.B.

Mh

?T

2A

1

Mhs

2A

3.0

UT

2A

3A

2A

Government Offices

2A

MER 19259

E.S.B. Aurora Telecom Inserted Gas Pipe Aurora Telecom Sub-duct Aurora Telecom Duct Aurora Telecom Fibre Optic Cable LS

1A

Mh C=0.7

3A

2A

Mh

H

C=0.6

3A

1A

TK

Mill (Site of)

MER 19388

Mh

3A

Mh

Dean's Hall

H

3A

2A

?T

2A

2A

63 PE 75 mbar (Unverified)

2A

2A

SCHOOL

C=0.6 UT

2A

MER 10750

School

2A

?T

3A

Mh

2A

2A

2A

C=0.48

4.5

MER 10749

1A

Mh C=0.6

E.S.B.

ET

E.S.B.

2A

2A

LS

2A

1A

1A

2A 2A

MER 10748

2A

LS

?T

2A

C=0.4 TT

3A

2A

2A

Mhs

Mh

Mh

E.S.B.

2A 2A

2A

Mh

2A

3A

2A

2A

2A

2A

Mh

2A

C=0.7 32 PE 75 mbar

3A

E.S.B.

2A

2A

Mh

LS

2A

3A

2A

ET

2A

LS

2A

H

Mhs

Mh Contact Aurora Telecom on 1800-427-399 or (01)203-0120. 2A 2A [1.5 In]

3.5

2A

Mhs C=0.9 TT

2A

C=0.45

Mh

2A

ET

3A

2A

ET TT

2A

Mh

Mh

2A

2A

2A

Mh

H

2A [3 In]

LS

Mh

2A

2A

Mh

Mh

E.S.B.

3A

2A

32 PE 75 mbar

E.S.B. Distribution Pipe (Medium Pressure) Transmission Pipe (Construction Issue) Transmission Pipe (High Pressure) E.S.B. Mhs LS 2A 2A

2A 2A

FACTORY

2A

2A

E.S.B.

2A

Mh

2A

2A

2A

LS

2A C=0.5

2A 2A

LS

E.S.B.

2A

Mh

2A

2A

32 PE-80 75 mbar

2A

H

Mh

UT

2A

C=0.84

H

3A

3A

2A

Mh

2A

3A

8.6

Mhs

C=0.78

LS Service Pipe (Medium Pressure) Distribution Pipe (Low Pressure) Distribution Pipe (Abandoned) Inserted Pipe (Low Pressure) Inserted Pipe (Medium Pressure) Strategic Pipe (Low Pressure) Strategic Pipe (Medium Pressure) Service Pipe (Low Pressure)

2A

E.S.B.

2A

3A

LS

Mh

3A

E.S.B.

E.S.B.

H

3C

Mh

2A

LS

Elizabeth Fort (Disused)

LS

2A

2A

3C

UNVERIFIED

2A

Mh

MER 21122

3A

2A

3A

E.S.B.

2A

3A

MER 16682

Apts 1-5

H

(3 In)

2A C=0.6 32 PE 75 mbar

2A

2A

LS

3A

?T

Mhs

C=0.65

2A

LS

2A

3A

E.S.B.

H

TTTT

UNVERIFIED

G S Sta

2A

E.S.B.

2C

Mh

3A

3A

2A

MER 16681

E.S.B.

2A

Mh

2A C=0.5 32 PE 75 mbar

Round Tower (Site of)

3A

LS

LS

13.3

3A

H

H

3A

3A

E.S.B.

2A

Church (Site of)

C=0.36

3A

3A

LS TT

Mh

A

E.S.B.

?T

3A

3A

Mh ET 63 PE-X [3 In] 75 mbar ET LB

2A

2A

LS

MER 19399

3A

1A

2A

Former Church (C of I)

C=0.42

2C

3A

3A

2A

2A

3A

3A

3A

H

E.S.B.

2A

CP CP Test Point .C=? Cover (depth in meters)

E.S.B. Protection (Slabbing) Protection (Sleeve) Pressure Monitor E.S.B. E.S.B. ET Transition Tee Service Terminator Reducer E.S.B. 15 3A H Mhs LS Mh 8 Mh LS Mh 6 LS Mh Mh 3A 3A 2A UT TTTT

2C

3A

2C

2A

Mh

LS

E.S.B.

E.S.B.

E.S.B.

2C

2A

C=0.42

3A

LS

LS

2A

LS

2A UT

3A

LS

E.S.B.

2A

15.6

Hot Tap End Cap

MER 6405

3A

ET

2A

2A

3A

2A

H

2B

UT

3A

90 PE 75 mbar

2A

3A

Mh

3A

3A

3A

3A C=0.8 Mains Verification ** Valve Installation 2A C=0.6

90° BEND

(2 In)

3A

E.S.B.

C=0.5

3A

3A

3A

E.S.B.

3A

125 PE-X 75 mbar

17.4

2A

2A

16.5

3A 3A 3A 3A

3A

3A 3A

3A

E.S.B.

LS

3A

3A

C=0.6

LS

E.S.B.

Mh

3A

LS

E.S.B.

TT

H

TO MH=2.9

3A

[4 In]

Mh

LS

C=0.7

ET

LS

13.7

TT

3A

Mh

3A

15.2 ET

2A 2A

3A 3A

2A

3A

16.8

3A

2A

H

3A

E.S.B.

3A

2A

Mh

UT

Mh

3A

11.8

3A

2A

E.S.B.

[4 In]

3A

Mh

LS

LS

2A

E.S.B.

3A

UT

(3 In)

C=0.9

C=0.9

C=0.8

3A

90° BEND

H

E.S.B.

Mh

H

2A

3A

3A

ET

Mh

LS

Mh ** Please contact GNI on 1800-427747 for specific information.

3A 250 PE-80 75 mbar

3A

E.S.B.

1A

63 PE 75 mbar

2A

LS

ET

2A

H

C=0.6

LS

Mh

3A

3C

1A

TT

2A

LS

C=0.4

Flats

E.S.B.

3A

3A

2A

UT

3A

3A

1A

15.3

3A

C=0.4 MER 17817

19.0

LS

2A

3A

1A

3A

17.3

3A

E.S.B.

E.S.B. ET

E.S.B.

1A

2A 32 PE 75 mbar

3A

TT

3A C=0.64

?T

E.S.B.

3A

H

H TT C=0.7 Mh

0.7m TO VALVE

3A

LS

90° BEND

LS

MER 4640

3A

3A

3A

LS

2 In ST 75 mbar

3A

3A

UT

E.S.B.

ET

Mh

TT

E.S.B.

1A

3A

3A

3A Design Department - DUBLIN

H

19.1

LS

Mh ?T

1A

2A

3C

LS

3A

3A

3A

3A

ET

2A

Mh

Mh

Mh

1A

3C

Mh

1A

3A

63 PE-80 75 mbar

3A

2A

Mh

90 PE-X 75 mbar

3A

UT

3A

UT

1A

Davcon Court

C=0.5

Mh

1A

3A

2A

3A GAS NETWORK INFORMATION

3C

3A

3A

3A C=0.7 C=0.66

2A

3A

2A

C=0.6 32 PE 75 mbar

H

Mh MAIN LAID APPROX. 1m FROM BUILDINGS ON WATER TABLE.

H

LS

E.S.B.

C=0.64

3A

Mh

3A

2A

1A

3A

LS

E.S.B.

Issue:

3A

18.4

?T

E.S.B.

3A

2A

3A

C=0.63

3A

E.S.B.

3A

3A

LS

Mh

3A

Cork City Council

ES

MER 10465

2A

3A

Meter Unit SR

3A

2A

LS

ET

3A

H

3A

3A

TT

Mh

2A

3A

3A 32 PE 75 mbar

E.S.B.

3A

3A

TT

3A

3A

Location:

3A

2A

3A

TK

0

20

40

60

80

3A 100 m

3A

2A

LS

TT

3A 3A

32 PE 75 mbar

3A

E.S.B. Elizabeth Fort Barrack Street Cork 3A

3A

3A

E.S.B.

3A

3A

3A

2A

2A

3A

3A

3A

E.S.B.

E.S.B.

Mh

E.S.B.

LS

LS

3A

3A

3A

2A

3A

LS

3A Plot Date: 3A

3A Contact:

2A

Mh

3A

3A

3A

3A

3A

3A

20.1

3A

Mh

LS

H

MER 11152

3A

3A

H

06/12/2021

E McElroy

2A

2A

3A

3A

3A

3A

3A

3A

3A

3A

LS TT TT

Mh

LS

3A REPRODUCED FROM THE ORDNANCE SURVEY BY PERMISSION OF THE GOVERNMENT. LICENCE No. 3-3-34

2A

3A

E.S.B.

3A

3A

C=0.6

2A

3A

E.S.B.

3A

3A

3A

3A

3A

3A

Plotted by:

Scale:

C=0.6

2A

3A

3A

E.S.B.

E.S.B.

3A

3A

2A

H

3A

3A

3A

LS

3A

3A

KOC

1:1000

Mh

[3 In]

3A

Mh

3A

3A

3A

2A

3A

LS

3A

Not Archived - Alternative : |Network Maintenance Dublin|2021_Kevin_Plots

Powered by