CAR PARK
Car Park
E.S.B. Service pipes are not generally shown but their presence should always be anticipated. High pressure transmission pipelines are shown in red. If a transmission pipeline is identified within 10m of any intended excavations then work must not proceed before GNI has been consulted. The true location and depth of a transmission pipeline must be verified on site by a representative of GNI. Contact can be made through 1800 427 747. All work in the vicinity of the gas network must be completed in accordance with the E.S.B. E.S.B. Mh current edition of the Health & Safety Authority publication, Code of Practice For Avoiding Danger From Underground Services which is available from the Health and Safety Authority (01 614 7 00) or can be downloaded at www.hsa.ie. LS Nano Nagle Bridge Important Safety Notice: Damage to gas pipelines can result in serious injury or death. Gas network information is provided as a general guide. The exact location and depth of medium or low pressure distribution gas pipes must be verified on site by carrying out necessary investigations, including, for example, hand digging trial holes along the route of the pipe. 2 In ST 75 mbar Mh LS 2.8 LS Mh Mh 180 PE-A [14 In] 75 mbar
Tk
ED Bdy
E.S.B.
LS
3A
Mh
Church (Site of)
Tks
Mh
NORTH.
South Gate Bridge
2B
E.S.B.
ET
LS
Mh
H
Dean's Hall
CASTLE
[2 In]
E.S.B.
Mh
180 PE-X [10
H
3.1
180 PE-X [10 In] 75 mbar
Mh
2A
2A
ET Legal Notice:
ET
LS
Weir
Mh
ET
1A
2A Gas Networks Ireland (GNI) and its affiliates, accept no responsibility for the accuracy of any information contained in this document including data concerning location and technical designation of the gas distribution and transmission network (the Information). The Information should not be relied on for accurate distance or depth of cover measurements. (10 In) C=1.0m C=0.47 TT C=0.75
School
E.S.B.
3.6 C=0.9 ET ?T
LS
C=0.8
E.S.B.
LS
C=0.8
63 PE 75 mbar
3A
63 PE-X 75 mbar
E.S.B.
5.3
63 PE 75 mbar (Unverified)
E.S.B.
2A
LS
Slipway
2
2A
LS TT
3
E.S.B.
63 PE-X [3 In] 75 mbar
UT
H
LS
H
H
LS
Mhs Any representations and warranties, express or implied, are excluded to the fullest extent permitted by law. No liability shall be accepted for any loss or damage including, without limitation, direct, indirect or consequential loss, arising out of or in connection with the use or re-use of the Information. Mh Mh
E.S.B.
MER 19374
Mh
LS
CONVENT PLACE
E.S.B.
2A
Mh UT
Abbey (Site of)
3A
H
LS
LS
Mhs
E.S.B.
E.S.B.
LS
2A
2A
C=0.6
E.S.B.
Mh
?T
2A
1
Mhs
2A
3.0
UT
2A
3A
2A
Government Offices
2A
MER 19259
E.S.B. Aurora Telecom Inserted Gas Pipe Aurora Telecom Sub-duct Aurora Telecom Duct Aurora Telecom Fibre Optic Cable LS
1A
Mh C=0.7
3A
2A
Mh
H
C=0.6
3A
1A
TK
Mill (Site of)
MER 19388
Mh
3A
Mh
Dean's Hall
H
3A
2A
?T
2A
2A
63 PE 75 mbar (Unverified)
2A
2A
SCHOOL
C=0.6 UT
2A
MER 10750
School
2A
?T
3A
Mh
2A
2A
2A
C=0.48
4.5
MER 10749
1A
Mh C=0.6
E.S.B.
ET
E.S.B.
2A
2A
LS
2A
1A
1A
2A 2A
MER 10748
2A
LS
?T
2A
C=0.4 TT
3A
2A
2A
Mhs
Mh
Mh
E.S.B.
2A 2A
2A
Mh
2A
3A
2A
2A
2A
2A
Mh
2A
C=0.7 32 PE 75 mbar
3A
E.S.B.
2A
2A
Mh
LS
2A
3A
2A
ET
2A
LS
2A
H
Mhs
Mh Contact Aurora Telecom on 1800-427-399 or (01)203-0120. 2A 2A [1.5 In]
3.5
2A
Mhs C=0.9 TT
2A
C=0.45
Mh
2A
ET
3A
2A
ET TT
2A
Mh
Mh
2A
2A
2A
Mh
H
2A [3 In]
LS
Mh
2A
2A
Mh
Mh
E.S.B.
3A
2A
32 PE 75 mbar
E.S.B. Distribution Pipe (Medium Pressure) Transmission Pipe (Construction Issue) Transmission Pipe (High Pressure) E.S.B. Mhs LS 2A 2A
2A 2A
FACTORY
2A
2A
E.S.B.
2A
Mh
2A
2A
2A
LS
2A C=0.5
2A 2A
LS
E.S.B.
2A
Mh
2A
2A
32 PE-80 75 mbar
2A
H
Mh
UT
2A
C=0.84
H
3A
3A
2A
Mh
2A
3A
8.6
Mhs
C=0.78
LS Service Pipe (Medium Pressure) Distribution Pipe (Low Pressure) Distribution Pipe (Abandoned) Inserted Pipe (Low Pressure) Inserted Pipe (Medium Pressure) Strategic Pipe (Low Pressure) Strategic Pipe (Medium Pressure) Service Pipe (Low Pressure)
2A
E.S.B.
2A
3A
LS
Mh
3A
E.S.B.
E.S.B.
H
3C
Mh
2A
LS
Elizabeth Fort (Disused)
LS
2A
2A
3C
UNVERIFIED
2A
Mh
MER 21122
3A
2A
3A
E.S.B.
2A
3A
MER 16682
Apts 1-5
H
(3 In)
2A C=0.6 32 PE 75 mbar
2A
2A
LS
3A
?T
Mhs
C=0.65
2A
LS
2A
3A
E.S.B.
H
TTTT
UNVERIFIED
G S Sta
2A
E.S.B.
2C
Mh
3A
3A
2A
MER 16681
E.S.B.
2A
Mh
2A C=0.5 32 PE 75 mbar
Round Tower (Site of)
3A
LS
LS
13.3
3A
H
H
3A
3A
E.S.B.
2A
Church (Site of)
C=0.36
3A
3A
LS TT
Mh
A
E.S.B.
?T
3A
3A
Mh ET 63 PE-X [3 In] 75 mbar ET LB
2A
2A
LS
MER 19399
3A
1A
2A
Former Church (C of I)
C=0.42
2C
3A
3A
2A
2A
3A
3A
3A
H
E.S.B.
2A
CP CP Test Point .C=? Cover (depth in meters)
E.S.B. Protection (Slabbing) Protection (Sleeve) Pressure Monitor E.S.B. E.S.B. ET Transition Tee Service Terminator Reducer E.S.B. 15 3A H Mhs LS Mh 8 Mh LS Mh 6 LS Mh Mh 3A 3A 2A UT TTTT
2C
3A
2C
2A
Mh
LS
E.S.B.
E.S.B.
E.S.B.
2C
2A
C=0.42
3A
LS
LS
2A
LS
2A UT
3A
LS
E.S.B.
2A
15.6
Hot Tap End Cap
MER 6405
3A
ET
2A
2A
3A
2A
H
2B
UT
3A
90 PE 75 mbar
2A
3A
Mh
3A
3A
3A
3A C=0.8 Mains Verification ** Valve Installation 2A C=0.6
90° BEND
(2 In)
3A
E.S.B.
C=0.5
3A
3A
3A
E.S.B.
3A
125 PE-X 75 mbar
17.4
2A
2A
16.5
3A 3A 3A 3A
3A
3A 3A
3A
E.S.B.
LS
3A
3A
C=0.6
LS
E.S.B.
Mh
3A
LS
E.S.B.
TT
H
TO MH=2.9
3A
[4 In]
Mh
LS
C=0.7
ET
LS
13.7
TT
3A
Mh
3A
15.2 ET
2A 2A
3A 3A
2A
3A
16.8
3A
2A
H
3A
E.S.B.
3A
2A
Mh
UT
Mh
3A
11.8
3A
2A
E.S.B.
[4 In]
3A
Mh
LS
LS
2A
E.S.B.
3A
UT
(3 In)
C=0.9
C=0.9
C=0.8
3A
90° BEND
H
E.S.B.
Mh
H
2A
3A
3A
ET
Mh
LS
Mh ** Please contact GNI on 1800-427747 for specific information.
3A 250 PE-80 75 mbar
3A
E.S.B.
1A
63 PE 75 mbar
2A
LS
ET
2A
H
C=0.6
LS
Mh
3A
3C
1A
TT
2A
LS
C=0.4
Flats
E.S.B.
3A
3A
2A
UT
3A
3A
1A
15.3
3A
C=0.4 MER 17817
19.0
LS
2A
3A
1A
3A
17.3
3A
E.S.B.
E.S.B. ET
E.S.B.
1A
2A 32 PE 75 mbar
3A
TT
3A C=0.64
?T
E.S.B.
3A
H
H TT C=0.7 Mh
0.7m TO VALVE
3A
LS
90° BEND
LS
MER 4640
3A
3A
3A
LS
2 In ST 75 mbar
3A
3A
UT
E.S.B.
ET
Mh
TT
E.S.B.
1A
3A
3A
3A Design Department - DUBLIN
H
19.1
LS
Mh ?T
1A
2A
3C
LS
3A
3A
3A
3A
ET
2A
Mh
Mh
Mh
1A
3C
Mh
1A
3A
63 PE-80 75 mbar
3A
2A
Mh
90 PE-X 75 mbar
3A
UT
3A
UT
1A
Davcon Court
C=0.5
Mh
1A
3A
2A
3A GAS NETWORK INFORMATION
3C
3A
3A
3A C=0.7 C=0.66
2A
3A
2A
C=0.6 32 PE 75 mbar
H
Mh MAIN LAID APPROX. 1m FROM BUILDINGS ON WATER TABLE.
H
LS
E.S.B.
C=0.64
3A
Mh
3A
2A
1A
3A
LS
E.S.B.
Issue:
3A
18.4
?T
E.S.B.
3A
2A
3A
C=0.63
3A
E.S.B.
3A
3A
LS
Mh
3A
Cork City Council
ES
MER 10465
2A
3A
Meter Unit SR
3A
2A
LS
ET
3A
H
3A
3A
TT
Mh
2A
3A
3A 32 PE 75 mbar
E.S.B.
3A
3A
TT
3A
3A
Location:
3A
2A
3A
TK
0
20
40
60
80
3A 100 m
3A
2A
LS
TT
3A 3A
32 PE 75 mbar
3A
E.S.B. Elizabeth Fort Barrack Street Cork 3A
3A
3A
E.S.B.
3A
3A
3A
2A
2A
3A
3A
3A
E.S.B.
E.S.B.
Mh
E.S.B.
LS
LS
3A
3A
3A
2A
3A
LS
3A Plot Date: 3A
3A Contact:
2A
Mh
3A
3A
3A
3A
3A
3A
20.1
3A
Mh
LS
H
MER 11152
3A
3A
H
06/12/2021
E McElroy
2A
2A
3A
3A
3A
3A
3A
3A
3A
3A
LS TT TT
Mh
LS
3A REPRODUCED FROM THE ORDNANCE SURVEY BY PERMISSION OF THE GOVERNMENT. LICENCE No. 3-3-34
2A
3A
E.S.B.
3A
3A
C=0.6
2A
3A
E.S.B.
3A
3A
3A
3A
3A
3A
Plotted by:
Scale:
C=0.6
2A
3A
3A
E.S.B.
E.S.B.
3A
3A
2A
H
3A
3A
3A
LS
3A
3A
KOC
1:1000
Mh
[3 In]
3A
Mh
3A
3A
3A
2A
3A
LS
3A
Not Archived - Alternative : |Network Maintenance Dublin|2021_Kevin_Plots
Powered by FlippingBook