Part 8 Design Statement - Elizabeth Fort, Cork City

Fig.5: Proposed Stage Structure Rendering – Night ‐ time Performance with Waterproof Covering

In addition to the proposed Outdoor Public Spaces Scheme and to facilitate audiences for outdoor cultural events an alternative Fire Exit is proposed to accommodate larger events via an existing bricked ‐ up exit to adjacent Fort St (See Fig.7 ‐ Page18). Proposed new landing and railings to exit at Fort St. in lieu of 1no. existing car parking space. All proposed works will be overseen by suitably qualified Conservation Engineers in liaison with Cork City Council’s Conservation Officer and the City Architects Department. Specific works which require monitoring by a qualified licensed Archaeologist are also outlined in detail within the Architectural Heritage Impact Assessment part of this report. Cork City Council with endeavour to minimise the impact on the Fort’s current uses, neighbouring homes, and businesses during the construction period, which is envisaged to last a maximum duration of only 2 ‐ 3 months. Cork City Council will also develop a policy regarding use of the outdoor stage at Elizabeth Fort and events may take place during the day or evening but in all cases, patrons will be required to vacate the premises no later than 11pm.

8

Powered by