Volume 1 Written Statement

Objective 9.1

Objective 9.3 Group Water Schemes, Private Wells and Individual Treatment Systems a. To require that all developments where public watermains are available or likely to be available and have sufficient capacity, shall connect to them. b. To ensure that all new developments connect to the public wastewater infrastructure, where available, and to encourage existing developments that are in close proximity to a public sewer to connect to that sewer, subject to a connection agreement with Irish Water. c. To discourage the provision of single house septic tanks and treatment plants to minimise the risk of groundwater pollution in line with the rural housing policy of this Plan. Where such facilities are permitted, full compliance with the prevailing regulations and standards, including the EPA’s Code of Practice Wastewater Treatment and Disposal Systems Serving Single Houses (PE. ≤10) (EPA 2009), and its replacement the EPA Code of Practice for Domestic Wastewater Treatment Systems (Population Equivalent ≤ 10) (2021), will be required. d. Residential development that requires the provision of private wastewater treatment facilities (i.e. Developer Provided Infrastructure), other than single house systems will generally not be permitted. e. To ensure that private wastewater treatment facilities, where permitted, are operated in compliance with their wastewater discharge license, in order to protect water quality.

Irish Water a. To work with Irish Water to ensure the efficient and sustainable use and development of water resources and water services infrastructure in the City. b. To work with Irish Water to identify and facilitate the timely delivery of water and wastewater projects in order to facilitate development in accordance with the Core Strategy. c. To work with Irish Water in promoting water conservation and demand management measures among users and support the implementation of measures such as leakage reduction and network improvements. d. To support Irish Water in the development and implementation of the National Water Resources Plan and Drinking Water Safety Plans. e. To support Irish Water in the promotion of effective management of trade discharges to sewers in order to maximise the capacity of existing sewer networks and minimise detrimental impacts on sewage treatment works.

Objective 9.2

Waste Water a. To require all new proposals for development to provide a separate foul and surface water drainage system and to incorporate Sustainable Urban Drainage Systems in so far as practical. b. As part of new proposals for development, evidence of consultation with Irish Water should be submitted as part of a planning application, demonstrating that adequate water services are available to service the development and that existing water services will not be negatively impacted.

292

Cork City Draft Development Plan 2022-2028

Volume 1 I Chapter 9

Powered by