Volume 1 Written Statement

Objective 9.4

Objective 9.6

Sustainable Urban Drainage Systems (SUDS)

Storm Water To provide adequate storm water infrastructure in order to accommodate the planned levels of growth within the plan area and to ensure that appropriate flood management measures are implemented to protect property and infrastructure.

a. To require that all planning applications for new development incorporate Sustainable Urban Drainage Systems (SUDS) in so far as possible. Such proposals shall be accompanied by a comprehensive SUDS assessment including run-off quantity, run off quality and impacts on habitat and water quality. b. To encourage the provision of green roofs and green walls as an integrated part of Sustainable Urban Drainage Systems (SUDS) and which provide benefits for biodiversity, wherever feasible. c. To investigate the feasibility of preparing Sustainable Urban Drainage Systems (SUDS) guidelines for Cork City during the lifetime of the plan.

Objective 9.7

Water Quality a. To ensure the delivery of the relevant policies and objectives of The River Basin Management Plan for Ireland 2018 – 2021 and any subsequent plan, including those relating to protection of water status, improvement of water status, prevention of deterioration and meeting objectives for designated protected sites. b. To support Irish Water in its implementation of Water Quality Management Plans for ground, surface, coastal and estuarine waters as part of the implementation of the EU Water Framework Directive and in the development of Drinking Water Protection Plans. c. To support the provision of mitigation and protection measures for all protected areas, including Drinking Water Protected Areas and associated Source Protection Plans in line with the Water Framework Directives and River Basin Management Plans. d. To have cognisance of, where relevant, the EU’s Common Implementation Strategy Guidance Documents No. 20 and 36 which provide guidance on exemptions to the environmental objectives of the Water Framework Directive.

Objective 9.5

Discharging a. To ensure that onsite petrol/oil interceptors and silt traps shall be installed to all significant road projects/upgrades or for proposals where surface water otherwise discharges to watercourses, to prevent hydrocarbon pollution of the receiving waters. b. To ensure that developments permitted by the Council which involve discharge of wastewater to surface waters or

groundwaters, comply with the requirements of the EU Environmental Objectives (Surface Waters) Regulations and EU Environmental Objectives (Groundwater) Regulations.

293

Cork City Draft Development Plan 2022-2028

Volume 1 I Chapter 9

Powered by