Indicative Plot Ratio
Dwellings Per Hectare
General Building
Building Height
Car Parking
Height
Range
Zone
2.25
n/a
7
6-10
South Docks Transition and Mid
Ground Plane
Finished Floor
Target Land Use
Key Infrastructure
Key Links To Be
Levels
Level (Min)
Split %
Provided
Residential
Min +0.7m OD
+3.85m OD until flood defences provided. Please refer to Figure 10.10b for levels following provision of flood barrier.
Kennedy Quay Flood Defence Barrier Kent Station Bridge Water Street Bridge Catalyst Developments at Odlums Buildings & Fordson Building Albert Quay Kennedy Quay Centre Park Road Kennedy Spine
Kennedy Quay Greenway
30
Water Street Extension Pedestrian / Cycle Street
Non-Residential
70
Table 10.8: Ford Dunlop Quarter.
Indicative Plot Ratio
Dwellings Per Hectare
General Building
Building Height
Car Parking
Height
Range
Zone
2.25
250
7
6-10
South Docks: Mid
Ground Plane
Finished Floor
Target Land Use
Key Infrastructure
Key Links To Be
Levels
Level (Min)
Split %
Provided
Residential
Min +0.7m OD
+3.85m OD until flood defences provided. Please refer to Figure 10.10b for levels following provision of flood barrier.
Kennedy Quay Centre Park Road – Water Street Link Water Street Bridge
Kennedy Quay Greenway
85
Water Street Extension Pedestrian / Cycle Street
Non-Residential
15
Table 10.9: Wharf Quarter.
Indicative Plot Ratio
Dwellings Per Hectare
General Building
Building Height
Car Parking
Height
Range
Zone
2.5
250
7
6-10
South Docks East
Ground Plane
Finished Floor
Target Land Use
Key Infrastructure
Key Links To Be
Levels
Level (Min)
Split %
Provided
Residential
Min +0.7m OD
+3.85m OD until flood defences provided. Please refer to Figure 10.10b for levels following provision of flood barrier.
Post Primary School Centre Park Road Eastern Gateway Bridge
Kennedy Quay Greenway
90
Non-Residential
10
Table 10.10: Marina Walk.
337
Cork City Draft Development Plan 2022-2028
Volume 1 I Chapter 10