Figure 10.17: Tivoli Docks Draft ABTA - Transport Infrastructure Requirements.
10.150 The Draft ABTA provides further details on the range of transport infrastructure necessary to deliver this movement strategy, including some initial design concepts.
Significant infrastructural investment will be required as part of every phase, including notable upfront investment in the train station, the new eastern access, the central bus corridor and mobility hubs.
Figure 11 Tivoli Docks Pedestrian and Cycle Network Figure 10.18: Indicative Tivoli Docks Pedestrian and Cycle Network
358
Cork City Draft Development Plan 2022-2028
Volume 1 I Chapter 10
21
Powered by FlippingBook