CLIENT:
Cork City Council
PROJECT NAME: REPORT TITLE:
Cork City Electric Vehicle Charging Strategy
SEA Environmental Report
9. POST DRAFT STRATEGY CONSULTATION MODIFICATIONS
This document is the final SEA Environmental Report produced on adoption of the Strategy. An earlier draft version of this report has been updated having regard to the consultation submissions made during the SEA consultation period, recommendations made in the Chief Executive (CE) Report on consultation submissions, and the modifications made to the original draft version of the Strategy that was put on display for consultation. The updates made to the report were clerical or minor and non-material in nature and have not changed the parameters of the environmental assessment undertaken or the environmental mitigation defined. The Strategy modifications arising from the consultation process, the CE Report, and the post consultation plan- making process were screened for SEA and AA. The SEA Screening Report and AA Screening Report for the post consultation Strategy modifications are presented in Appendix 4 and Appendix 5 respectively. The Strategy modifications were determined to be non-material and did not introduce any additional environmental effects not previously considered and mitigated during the SEA and AA processes. An SEA Statement will now be prepared presenting how the SEA process has shaped the content of the final Strategy and SEA documentation.
www.fehilytimoney.ie
P23-206
Page 96 of 103
Powered by FlippingBook