PROJECT NAME:
Strategic Environmental Assessment Screening Report
4. STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING
This section of the report documents the SEA Screening undertaken. Stage 1 Applicability Analysis was undertaken initially. This analysis is detailed in Section 4.1 of this report (Table 4-1 and Table 4-2). Stage 2 Screening Analysis was then undertaken. This analysis is detailed in Section 4.2 of this report (Table 4-3, Table 4-4 and Table 4-5).
4.1 Stage 1 - SEA Applicability Analysis Table 4-1: SEA Applicability Analysis SEA Applicability Analysis Status of Plan/Programme Maker Is the P/P prepared and/or adopted by an authority at national, regional or local level or prepared by an authority for adoption through a legislative procedure by Parliament or Government? Is the P/P required by legislative, regulatory, or administrative provisions? Nature of the Plan/Programme Is the P/P prepared for agriculture, forestry, fisheries, energy, industry, transport, waste management, water management, telecommunications, tourism, town and country planning or land use? Does the P/P provide a framework for the development consent for projects listed in the EIA Directive? Is the P/P likely to have a significant effect on a Natura 2000 site which leads to a requirement for Article 6 or 7 assessments?
The Strategy has been prepared by a local authority as supported by the National Climate Action Plan and the Cork City Development Plan.
The Strategy is not required by legislative, regulatory, or administrative provisions, however, is supported by the National Climate Action Plan and the Cork City Development Plan.
The Strategy is prepared for transport, energy, and town planning to meet the needs of the Climate Action Plan target of 940,000 electric vehicles in total by 2030.
Neither Strategy nor the Strategy Modifications provide a framework for development consent.
An AA Screening Report has been completed for the Draft Strategy and Strategy modifications arising following the Strategy/SEA consultation period. These documents have concluded that the neither the Draft Strategy nor Strategy modifications will not give rise to any significant effects on designated European sites, alone or in combination with other plans or projects, with the adoption of defined mitigation measures.
Exemptions Is the sole purpose of the P/P to serve national defence or civil emergency or is it
No, for all questions.