CE Report on the Draft Plan Consultation Volume 1

Submission from the Office of the Planning Regulator (Submission No 426)

Issues / Recommendations / Observations

Chief Executive’s Resp onse & Recommendation

(ix) Insert the following text in Objective 10.82 Castletreasure Expansion Area: The phasing and the number of dwellings which can proceed and be occupied within defined periods shall be agreed in advance at Development Management stage but will be dependent on the following, • The timing and provision of appropriate vehicular access, including provisions for future public transport requirements in the immediate site area, pedestrian and cycling access to be identified in a traffic and transportation study, to be conducted at an early stage post plan adoption. • The upgrade and completion of the proposed N28/M28 national road and ancillary local network improvements. Any development proposals shall contain noise attenuation measures. The timing and provision of appropriate drinking water and waste water disposal services for the development including where necessary the upgrading of off-site infrastructure. Additionally, any development proposals on site shall make provision for the following: • Retention of the existing trees and hedgerows within the overall development of the site where practicable. • A detailed ecological survey for the entire site carried out by a suitably qualified ecologist. • A construction management plan with detailed proposals for the protection of riparian zones within the site. • A detailed surface water management plan including provision for on-site attenuation.

56

Powered by