CE Management Report April 2020.pdf

Pavement Surface Condition Index (km)

Pavement Surface Condition Index (Km): 2020

Apr

Jan 2020

Feb 2020

Mar 2020

Cumulative

1.29

7.35

1.53

0

8.64

Regional

6.50

0.38

0.33

0

6.85

Local Primary

Local Secondary

0.93

6.32

6.10

0

7.25

Local Tertiary

0

0.15

0.01

0

0.15

Regional Roads Grants (km Strengthened) Regional Roads Grants: Km Strengthened

Apr-Jun

Jan-Mar 2018

Apr-Jun 2018

Jul-Sep 2018

Oct – Dec 2018

Jan-Mar 2019

Apr-Jun 2019

Jul-Sept 2019

Oct-Dec 2019

Jan-Mar 2020

Cumulative

0

0

0

1.23

0

0

2.34

1.32

0

0

0

Public Liability Claim Reports

45

40

2018

40

2019

35

2020

30

25

20

13

15

10

6

3

5

0

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Roads Maintenance Programmes SOUTHSIDE General Maintenance Ongoing pothole repairs Covid19 Park Ranger Duty Delivering Meals on Wheels

Road Surface Repairs Avondale Park

NORTHSIDE General Maintenance

Footpath Renewal/Repair: Paul St St Peter and Pauls Lane Lavitts Quay

Sewer Connections: St. Johns Well

Bollard repairs /replacement Daunts Square

Ongoing pothole repairs Ongoing gully cleaning

Covid – 19: Park Ranger duty Delivering meals on wheels

34

Powered by