Pavement Surface Condition Index (km)
Pavement Surface Condition Index (Km): 2020
Apr
Jan 2020
Feb 2020
Mar 2020
Cumulative
1.29
7.35
1.53
0
8.64
Regional
6.50
0.38
0.33
0
6.85
Local Primary
Local Secondary
0.93
6.32
6.10
0
7.25
Local Tertiary
0
0.15
0.01
0
0.15
Regional Roads Grants (km Strengthened) Regional Roads Grants: Km Strengthened
Apr-Jun
Jan-Mar 2018
Apr-Jun 2018
Jul-Sep 2018
Oct – Dec 2018
Jan-Mar 2019
Apr-Jun 2019
Jul-Sept 2019
Oct-Dec 2019
Jan-Mar 2020
Cumulative
0
0
0
1.23
0
0
2.34
1.32
0
0
0
Public Liability Claim Reports
45
40
2018
40
2019
35
2020
30
25
20
13
15
10
6
3
5
0
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Roads Maintenance Programmes SOUTHSIDE General Maintenance Ongoing pothole repairs Covid19 Park Ranger Duty Delivering Meals on Wheels
Road Surface Repairs Avondale Park
NORTHSIDE General Maintenance
Footpath Renewal/Repair: Paul St St Peter and Pauls Lane Lavitts Quay
Sewer Connections: St. Johns Well
Bollard repairs /replacement Daunts Square
Ongoing pothole repairs Ongoing gully cleaning
Covid – 19: Park Ranger duty Delivering meals on wheels
34
Powered by FlippingBook