CE Management Report November 2020.pdf

Development Management Significant Planning Applications decided: The following significant Planning Applications were GRANTED permission.

TP20/39165 Permission for the redevelopment of the Leisureplex site, No.1 MacCurtain Street and Brian Boru Street, Cork to provide for a 171-bedroom hotel. The proposed development consists of: the demolition of existing structures; retention of and modifications to the existing façade of the Former Postal Sorting Offices (Protected Structure PS007); the construction of a 5-7 storey hotel including a bar and restaurant at ground floor level, roof top plant at 5th floor level, a new service vehicle access onto MacCurtain Street, a service yard including an external plant area and generator enclosure, all ancillary signage and all associated site development works. The proposed development consists of the carrying out of works to Protected Structure PS007. Leisureplex site No.1 MacCurtain Street and Brian Boru Street Decision to Grant made 18/11/2020 TP20/39390 Permission for the refurbishment of change of use of an existing disused commercial premises to provide a 19 no. bedroom guest accommodation facility with a total of 43 no. bed spaces, a ground floor café and all ancillary works at Lower Oliver Plunkett Stre et and O’Connell Street. Decision to Grant 24/11/2020 20/39403 Permission for the construction of 66 no. dwelling houses and all associated ancillary development works including pedestrian access, parking, footpaths, drainage, and landscaping at 'Glashaboy View', Sallybrook, Riverstown, Glanmire, Cork. The proposed dwelling units will replace 57 no. units previously permitted under Cork County Council Ref. 18/4551 (An Bord Pleanala Ref. ABP- 302209-18) Glashaboy View Sallybrook Riverstown Glanmire Decision to Grant made 10/11/2020 UPDATE ON STRATEGIC HOUSING DEVELOPMENTS Applications made to An Bord Pleanála under section 4 of the Planning and Development (Housing) and Residential Tenancies, Act 2016 as amended.

An Bord Pleanála Decisions awaited/ In Process Reference 308111-20

113 residential units, a two-storey creche at Maglin Road, Ballincollig.

2 nd November 2020

CCC issued CE Report

Decision Due from ABP

January 2021

An Bord Pleanála Decisions awaited/ In Process Reference 308156-20

150 residential units, Monacnapa.

5 th November 2020

CCC issued CE Report

Decision Due from ABP

January 2021

Development Management metrics:

Powered by