CE Management Report September 2020.pdf

Drainage Repair Contract 2020: Works commenced 07/07/2020 and are on-going.

Footpath Replacement Contract 2020: Works commenced 07/07/2020 and are on-going.

Weed Control 2020: The 2020 weed control contract is now completed.

Updates for 2020 Road Resurfacing Programme The following roads were resurfaced during September – R= Regional Road; L = Local Road; E = Estate Road

Most of the locations were on the Southside, with the exception of the North Ring Road

City North Area:

North Ring Road (R)

City South Area:

• • • • • • • •

Togher Road (L)

Magazine Road (East) (R) Magazine Road (West) (R)

Argideen Lawn (L) Westside Estate (L)

Wilton Road (North) (R) Wilton Road (South) (R)

St Anne’s Park (E)

Douglas Area

• • • • •

Bromley (L)

Calderwood (L)

Lyndon Crescent (L)

The Downs, Broadale (L)

Douglas Lawn (L)

Ballincollig Area

• •

Carriganarra (L)

Castle Avenue, Muskerry (E)

Altogether, approximately 70% of the works programme had been completed by the end of September.

Night-time works have commenced and will continue throughout October. On target for programme completion by second week in November. Transport Pay Parking Income Street Parking was free during Covid Lockdown