Chapter 5 I Climate Change and the Environment
Development Plan
Policy
Climate Change
Chapter
Objective
Mitigation/Adaptation Contribution
Chapter 9 Environmental Infrastructure and Management
• Strategic Objective 8 • Objectives 9.2, 9.4, 9.5, 9.6 and 9.7 (Sustainable Urban Drainage Systems / storm water) • Objectives 9.8, 9.9 and 9.10 (Flood Protection) • Objective 9.12 (Waste Management) • Objective 9.15 (Renewable Energy) • Objective 9.17 (Cork Smart Gateway) • Objective 9.18 (Air Quality)
• Circular economy principles • Sustainable Urban Drainage Systems (SuDS) • Improving water quality / reducing water pollution risk • Flood risk management • Renewable/clean energy production • Sustainable waste management • Cork Smart Gateway • Air Quality
Chapter 10 Key Growth Areas and Neighbourhood Development Sites Chapter 11 Placemaking
• Site or area-specific actions or requirements identified where appropriate.
• All
• Strategic Objective 9 • All Standards and Guidance
• Climate-resilient placemaking • Greening the City • Travel Plans
and Managing Development
• Presumption in favour of reusing and refurbishing existing buildings • Maximum parking standards and minimum parking/charging standards for electric vehicles • Cycle to work facilities and bicycle parking • Sustainable water management and flood risk • Renewable energy • Waste management • Scheme Sustainability Statements
159
Cork City Development Plan 2022-2028 I Volume 1
Powered by FlippingBook