CE Management Report October 2020.pdf

VICTORIA ROAD, ALBERT QUAY & TERENCE MACSWINEY QUAY Construction tender documents are under development with tender completion to commence in the coming two/three weeks.

DONOVAN’S ROAD, COLLEGE ROAD, MAGAZINE ROAD TO GLASHEEN LINK Detailed design is complete for Donovan’s Rd and College Rd. Design ongoing for Melbourne Rd and Magazine Li nk. Construction of Donovan’s Rd and College Rd to commence in the coming weeks.

MELBOURN ROAD AND ROSSA AVENUE Detailed design progressing. Construction to commence at the end of Nov.

Environment Tree Works Location

Work Undertaken

Halldene Mount Eden Kenley Drive Western Road Park Court

Alder trees pruned Sycamore, Ash broken crowns removed Ash, Chestnut broken crowns removed damaged Lime tree removed Popular 2 Maple pruned, Salix, Ash crowns broken removed

7 Elms plus Maple removed. Maple broken crown removed Maple Holly Silver Birch removed Popular damaged crown 10 Lime trees crown raised

Ballinahaspig Sarsfield Terance Douglas Pool Donovan Road Popes Quay Cardinal Court Curraheen Estate Lower Glanmire Road Railway Place Woodhaven

London Plane damaged branches removed dead Alder removed 4 Alder, 6 Ash pruned Ash removed Storm damaged branches removed

line of trees crown raised fallen evergreen removed

Parks, Cemeteries & Recreation Grounds Maintenance

Management and Maintenance of Parks, Open Space Areas, Outdoor Amenities and Recreation Facilities. Grass mowing, Roadside Verge Maintenance, Nature & Conversation Areas, Litter Collection & Disposal, Graffiti Removal, Floral Displays, Tree Planting. Maintain in accordance with BS 7370: Part 3: 1991 – Category D, F & H. Herbicide Application in accordance with BS 7370 Part 3 & $. Locations: North West, North East, City Centre, South East, South West and Extended Boundary Areas. Litter Collection & Disposal: Parks, Open Space Areas/ Amenity Walks Litter, Fly tipping, Domestic Refuse. Essential Service during COVID – 19 Pandemic

Playground Inspections: Inspect, maintain & repair in accordance with BS 5696 Part 3.

Daily -15 visual (105 weekly) Weekly – 15 – Technical (Foreperson) Monthly – 15 – Technical (Engineer) Annual – 15-External Engineer Technical Playgrounds now open, but with signage advising COVID 19 guidance Repairs undertaken to O’Callaghan Park Playground in Glanmire

202- Daily inspections

Lifebuoy Service:

49

Powered by