VICTORIA ROAD, ALBERT QUAY & TERENCE MACSWINEY QUAY Construction tender documents are under development with tender completion to commence in the coming two/three weeks.
DONOVAN’S ROAD, COLLEGE ROAD, MAGAZINE ROAD TO GLASHEEN LINK Detailed design is complete for Donovan’s Rd and College Rd. Design ongoing for Melbourne Rd and Magazine Li nk. Construction of Donovan’s Rd and College Rd to commence in the coming weeks.
MELBOURN ROAD AND ROSSA AVENUE Detailed design progressing. Construction to commence at the end of Nov.
Environment Tree Works Location
Work Undertaken
Halldene Mount Eden Kenley Drive Western Road Park Court
Alder trees pruned Sycamore, Ash broken crowns removed Ash, Chestnut broken crowns removed damaged Lime tree removed Popular 2 Maple pruned, Salix, Ash crowns broken removed
7 Elms plus Maple removed. Maple broken crown removed Maple Holly Silver Birch removed Popular damaged crown 10 Lime trees crown raised
Ballinahaspig Sarsfield Terance Douglas Pool Donovan Road Popes Quay Cardinal Court Curraheen Estate Lower Glanmire Road Railway Place Woodhaven
London Plane damaged branches removed dead Alder removed 4 Alder, 6 Ash pruned Ash removed Storm damaged branches removed
line of trees crown raised fallen evergreen removed
Parks, Cemeteries & Recreation Grounds Maintenance
Management and Maintenance of Parks, Open Space Areas, Outdoor Amenities and Recreation Facilities. Grass mowing, Roadside Verge Maintenance, Nature & Conversation Areas, Litter Collection & Disposal, Graffiti Removal, Floral Displays, Tree Planting. Maintain in accordance with BS 7370: Part 3: 1991 – Category D, F & H. Herbicide Application in accordance with BS 7370 Part 3 & $. Locations: North West, North East, City Centre, South East, South West and Extended Boundary Areas. Litter Collection & Disposal: Parks, Open Space Areas/ Amenity Walks Litter, Fly tipping, Domestic Refuse. Essential Service during COVID – 19 Pandemic
Playground Inspections: Inspect, maintain & repair in accordance with BS 5696 Part 3.
Daily -15 visual (105 weekly) Weekly – 15 – Technical (Foreperson) Monthly – 15 – Technical (Engineer) Annual – 15-External Engineer Technical Playgrounds now open, but with signage advising COVID 19 guidance Repairs undertaken to O’Callaghan Park Playground in Glanmire
202- Daily inspections
Lifebuoy Service:
49
Powered by FlippingBook